PRODUCTION ACADEMY
Setup, registration, downtime, OEE, energy and layout — practical improvement work with the arithmetic attached.
Filters
6 articles
GuideIntermediate
Energy optimisation in garment decoration
Curing and pressing dominate the bill; scheduling beats equipment swaps.
7 min08/06/2026
GuideIntermediate
Facility and layout optimisation
Material travel is invisible labour cost.
6 min30/05/2026
GuideAdvanced
Improving OEE in a print shop
Availability × Performance × Quality — measured on the constraint, not on every machine.
9 min10/06/2026
GuideIntermediate
Improving registration quality and speed
Repeatable registration removes reprints, not just minutes.
7 min14/06/2026
GuideBeginner
Pretreatment optimisation for DTG
Less fluid, fewer rejects, better hand — usually at the same time.
6 min22/05/2026
GuideIntermediate
Reducing setup time
SMED for garment decoration: move work off the machine before you speed it up.
8 min28/06/2026