TL;DR
- Pre-registration off-press moves registration out of the machine's critical path.
- Savings scale with job count, not with volume — many small jobs benefit most.
- Only value the saved minutes if the press is capacity-limited or the hours are cash-effective.
A shop running 18 jobs a week at 14 minutes registration each loses more than 4 hours of press time weekly. On a capacity-limited press, that is sellable output. On an idle press, it is nothing at all — the distinction decides the investment.
Options
| System | Typical registration time | Best for |
|---|---|---|
| On-press manual | 10–20 min / job | Low job count, long runs |
| Pre-registration jig | 3–6 min / job | Mixed shops, fast payback |
| Camera / laser assisted | 2–4 min / job | High job count, tight tolerances |
| Fully automatic registration | < 2 min / job | High-mix automatic presses |
Hours = Jobs_per_month × (Time_before − Time_after) / 60
72 jobs per month, 14 → 5 minutes
- Press hours released
- 10.8 h / month
- If capacity-limited: extra sold output at margin
- ≈ €2,050 / month
- If demand-limited: cash value
- €0 — record as capacity only
Interactive example
Registration time released per month
- Hours released
- 10.8 h
- Value if capacity-limited
- € 2.052
- Value if demand-limited
- € 0
Same calculation kernel as the full calculators. For a decision-grade result, open the matching calculator.
Run the numbers in a calculator
Turn your own numbers into a bank-ready PDF report.
Create a reportRelated reading
Improving registration quality and speed
Repeatable registration removes reprints, not just minutes.
7 min14/06/2026
Reducing setup time
SMED for garment decoration: move work off the machine before you speed it up.
8 min28/06/2026
Typical setup, registration and cycle times
Time benchmarks that decide short-run profitability.